日本熟日本熟妇在线视频_超碰大字幕在线大字幕_色屋任你精品亚洲香蕉_思思热在线视频在线

18 Years Factory Mbr System - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Gaining purchaser gratification is our company's aim eternally. We're going to make great initiatives to create new and high quality products, satisfy your exclusive prerequisites and supply you with pre-sale, on-sale and after-sale solutions for Membrana Uf , Uf Filtration , Ultrafiltration Water Filter , Should further information be required, please contact us at any time!
18 Years Factory Mbr System - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo Detail:

Applications

● Purification of surface water.
● Reuse of heavy metal waste water.
● Pretreatment of RO.

Filtration Performance

Below filtration effects are proved according to the use of modified PVDF hollow fiber ultrafiltration membrane in different types of water:

No. Item Water?Output?Index
1 TSS ≤1mg/L
2 Turbidity ≤ 1

Specifications

Size

product-description1

Chart 1 MBR Size

Technical Parameters

Filtering?Direction Outside-in
Membrane?Material Reinforced?Modified?PVDF
Precision 0.03 ?micron
Membrane?Area 30m2
Membrane?ID/OD 1.0mm/ 2.2mm
Size 1250mm×2000mm×30mm
Joint?Size Φ24.5mm

Component Material

Component Material
Hollow?Fiber?Membrane Reinforced?Modified?PVDF
Sealing Compound Epoxy?Resins?+?Polyurethane (PU)
Housing ABS

Using Conditions

Proper pretreatments must be set when raw water contains a lot of impurities/coarse particles or large proportion of grease. Defoamer must be used to remove foams in membrane tank when necessary, please use alcoholic defoamer which is not easy to scale.

Item Limit Remark
PH?Range 5-9 (2- 12 when?washing) Neutral?PH?is?better?for?bacterial?culture
Particle?Diameter <2mm Prevent?sharp?particles?to?scratch?membrane
Oil?&?Grease ≤2mg/L Prevent?membrane?fouling/sharp?flux?decrease
Hardness ≤150mg/L Prevent?membrane?scaling

Application Parameters

Designed?Flux 15~40L/m2.h
Backwashing?Flux Twice?the?designed?flux
Operating?Temperature 5~45°C
Maximum?Operating?Pressure -50KPa
Suggested?Operating?Pressure ≤-35KPa
Maximum?backwashing?Pressure 100KPa
Operating?Mode Continuous?opeartion, intermittent?backwashing?air?flushing
Blowing?Mode Continuous?Aeration
Aeration?Rate 4m3/h.piece
Washing?Period Clean?water?backwashing?every?1~2h; CEB?every?1~2 days;Offline?washing?every?6~12 months

(Above?information?is?for?reference?only, please?adjust

according?to?actual?differential?pressure?change?rule)


Product detail pictures:

18 Years Factory Mbr System - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo detail pictures


Related Product Guide:

Our merchandise are commonly identified and dependable by end users and will meet continually altering financial and social desires for 18 Years Factory Mbr System - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo , The product will supply to all over the world, such as: Jamaica, New Orleans, Madrid, We are introduced as a one of the growing manufacture supplier and export of our products. We have a team of dedicated trained professional who take care the quality and timely supply. If you are looking for Good Quality at a good price and timely delivery. Do contact us.
  • The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
    5 Stars By Ada from UK - 2018.06.18 17:25
    The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Nainesh Mehta from Rio de Janeiro - 2018.06.19 10:42
    Write your message here and send it to us