日本熟日本熟妇在线视频_超碰大字幕在线大字幕_色屋任你精品亚洲香蕉_思思热在线视频在线

New Arrival China Membrane Design - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our team through professional training. Skilled professional knowledge, strong sense of service, to meet the service needs of customers for Uf System , Mbr Process , Microfiltration System , If you pursuit the Hi-quality, Hi-stable, Competitive price parts, company name is your nice choice!
New Arrival China Membrane Design - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo Detail:

Applications

● Purification of surface water.
● Reuse of heavy metal waste water.
● Pretreatment of RO.

Filtration Performance

Below filtration effects are proved according to the use of modified PVDF hollow fiber ultrafiltration membrane in different types of water:

No. Item Water?Output?Index
1 TSS ≤1mg/L
2 Turbidity ≤ 1

Specifications

Size

product-description1

Chart 1 MBR Size

Technical Parameters

Filtering?Direction Outside-in
Membrane?Material Reinforced?Modified?PVDF
Precision 0.03 ?micron
Membrane?Area 30m2
Membrane?ID/OD 1.0mm/ 2.2mm
Size 1250mm×2000mm×30mm
Joint?Size Φ24.5mm

Component Material

Component Material
Hollow?Fiber?Membrane Reinforced?Modified?PVDF
Sealing Compound Epoxy?Resins?+?Polyurethane (PU)
Housing ABS

Using Conditions

Proper pretreatments must be set when raw water contains a lot of impurities/coarse particles or large proportion of grease. Defoamer must be used to remove foams in membrane tank when necessary, please use alcoholic defoamer which is not easy to scale.

Item Limit Remark
PH?Range 5-9 (2- 12 when?washing) Neutral?PH?is?better?for?bacterial?culture
Particle?Diameter <2mm Prevent?sharp?particles?to?scratch?membrane
Oil?&?Grease ≤2mg/L Prevent?membrane?fouling/sharp?flux?decrease
Hardness ≤150mg/L Prevent?membrane?scaling

Application Parameters

Designed?Flux 15~40L/m2.h
Backwashing?Flux Twice?the?designed?flux
Operating?Temperature 5~45°C
Maximum?Operating?Pressure -50KPa
Suggested?Operating?Pressure ≤-35KPa
Maximum?backwashing?Pressure 100KPa
Operating?Mode Continuous?opeartion, intermittent?backwashing?air?flushing
Blowing?Mode Continuous?Aeration
Aeration?Rate 4m3/h.piece
Washing?Period Clean?water?backwashing?every?1~2h; CEB?every?1~2 days;Offline?washing?every?6~12 months

(Above?information?is?for?reference?only, please?adjust

according?to?actual?differential?pressure?change?rule)


Product detail pictures:

New Arrival China Membrane Design - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo detail pictures


Related Product Guide:

we could supply good quality goods, aggressive cost and very purchaser assistance. Our destination is You come here with difficulty and we supply you with a smile to take away for New Arrival China Membrane Design - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo , The product will supply to all over the world, such as: Honduras, Mombasa, Austria, We have been sincerely looking forward to cooperate with customers all over the world. We believe we can satisfy you with our high-quality products and solutions and perfect service . We also warmly welcome customers to visit our company and purchase our products.
  • In China, we have many partners, this company is satisfying to us, reliable quality and good credit, it is worth appreciation.
    5 Stars By Ingrid from Qatar - 2018.12.05 13:53
    Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
    5 Stars By Brook from UK - 2018.12.30 10:21
    Write your message here and send it to us