日本熟日本熟妇在线视频_超碰大字幕在线大字幕_色屋任你精品亚洲香蕉_思思热在线视频在线

New Delivery for Mbr Plant - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Sticking for the basic principle of Super high quality, Satisfactory service ,We've been striving to be an excellent business enterprise partner of you for Hollow Fiber Membrane , Ultrafiltration Unit , Mbr Bioreactor , Standing still today and looking into the future, we sincerely welcome customers all over the world to cooperate with us.
New Delivery for Mbr Plant - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo Detail:

Applications

● Purification of surface water.
● Reuse of heavy metal waste water.
● Pretreatment of RO.

Filtration Performance

Below filtration effects are proved according to the use of modified PVDF hollow fiber ultrafiltration membrane in different types of water:

No. Item Water?Output?Index
1 TSS ≤1mg/L
2 Turbidity ≤ 1

Specifications

Size

product-description1

Chart 1 MBR Size

Technical Parameters

Filtering?Direction Outside-in
Membrane?Material Reinforced?Modified?PVDF
Precision 0.03 ?micron
Membrane?Area 30m2
Membrane?ID/OD 1.0mm/ 2.2mm
Size 1250mm×2000mm×30mm
Joint?Size Φ24.5mm

Component Material

Component Material
Hollow?Fiber?Membrane Reinforced?Modified?PVDF
Sealing Compound Epoxy?Resins?+?Polyurethane (PU)
Housing ABS

Using Conditions

Proper pretreatments must be set when raw water contains a lot of impurities/coarse particles or large proportion of grease. Defoamer must be used to remove foams in membrane tank when necessary, please use alcoholic defoamer which is not easy to scale.

Item Limit Remark
PH?Range 5-9 (2- 12 when?washing) Neutral?PH?is?better?for?bacterial?culture
Particle?Diameter <2mm Prevent?sharp?particles?to?scratch?membrane
Oil?&?Grease ≤2mg/L Prevent?membrane?fouling/sharp?flux?decrease
Hardness ≤150mg/L Prevent?membrane?scaling

Application Parameters

Designed?Flux 15~40L/m2.h
Backwashing?Flux Twice?the?designed?flux
Operating?Temperature 5~45°C
Maximum?Operating?Pressure -50KPa
Suggested?Operating?Pressure ≤-35KPa
Maximum?backwashing?Pressure 100KPa
Operating?Mode Continuous?opeartion, intermittent?backwashing?air?flushing
Blowing?Mode Continuous?Aeration
Aeration?Rate 4m3/h.piece
Washing?Period Clean?water?backwashing?every?1~2h; CEB?every?1~2 days;Offline?washing?every?6~12 months

(Above?information?is?for?reference?only, please?adjust

according?to?actual?differential?pressure?change?rule)


Product detail pictures:

New Delivery for Mbr Plant - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo detail pictures


Related Product Guide:

Our company insists all along the quality policy of product good quality is base of enterprise survival; buyer fulfillment will be the staring point and ending of an company; persistent improvement is eternal pursuit of staff and also the consistent purpose of reputation very first, shopper first for New Delivery for Mbr Plant - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo , The product will supply to all over the world, such as: Slovakia, San Francisco, Surabaya, By continuous innovation, we will present you with more valuable items and services, and also make a contribution for the development of the automobile industry at home and abroad. Both domestic and foreign merchants are strongly welcomed to join us to grow together.
  • This manufacturer can keep improving and perfecting products and service, it is in line with the rules of market competition, a competitive company.
    5 Stars By Roland Jacka from Cancun - 2018.11.28 16:25
    The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 Stars By John from Italy - 2017.04.08 14:55
    Write your message here and send it to us