日本熟日本熟妇在线视频_超碰大字幕在线大字幕_色屋任你精品亚洲香蕉_思思热在线视频在线

Short Lead Time for Mbr Water - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

The really abundant projects administration experiences and just one to one particular provider model make the substantial importance of organization communication and our easy understanding of your expectations for Mbr Membrane , Mbr System , Membrane Filter Water Purifier , Besides, our enterprise sticks to high-quality and fair value, and we also offer you fantastic OEM solutions to several famous brands.
Short Lead Time for Mbr Water - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo Detail:

Applications

● Purification of surface water.
● Reuse of heavy metal waste water.
● Pretreatment of RO.

Filtration Performance

Below filtration effects are proved according to the use of modified PVDF hollow fiber ultrafiltration membrane in different types of water:

No. Item Water?Output?Index
1 TSS ≤1mg/L
2 Turbidity ≤ 1

Specifications

Size

product-description1

Chart 1 MBR Size

Technical Parameters

Filtering?Direction Outside-in
Membrane?Material Reinforced?Modified?PVDF
Precision 0.03 ?micron
Membrane?Area 30m2
Membrane?ID/OD 1.0mm/ 2.2mm
Size 1250mm×2000mm×30mm
Joint?Size Φ24.5mm

Component Material

Component Material
Hollow?Fiber?Membrane Reinforced?Modified?PVDF
Sealing Compound Epoxy?Resins?+?Polyurethane (PU)
Housing ABS

Using Conditions

Proper pretreatments must be set when raw water contains a lot of impurities/coarse particles or large proportion of grease. Defoamer must be used to remove foams in membrane tank when necessary, please use alcoholic defoamer which is not easy to scale.

Item Limit Remark
PH?Range 5-9 (2- 12 when?washing) Neutral?PH?is?better?for?bacterial?culture
Particle?Diameter <2mm Prevent?sharp?particles?to?scratch?membrane
Oil?&?Grease ≤2mg/L Prevent?membrane?fouling/sharp?flux?decrease
Hardness ≤150mg/L Prevent?membrane?scaling

Application Parameters

Designed?Flux 15~40L/m2.h
Backwashing?Flux Twice?the?designed?flux
Operating?Temperature 5~45°C
Maximum?Operating?Pressure -50KPa
Suggested?Operating?Pressure ≤-35KPa
Maximum?backwashing?Pressure 100KPa
Operating?Mode Continuous?opeartion, intermittent?backwashing?air?flushing
Blowing?Mode Continuous?Aeration
Aeration?Rate 4m3/h.piece
Washing?Period Clean?water?backwashing?every?1~2h; CEB?every?1~2 days;Offline?washing?every?6~12 months

(Above?information?is?for?reference?only, please?adjust

according?to?actual?differential?pressure?change?rule)


Product detail pictures:

Short Lead Time for Mbr Water - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo detail pictures


Related Product Guide:

Our commission is to serve our buyers and purchasers with effective good quality and aggressive portable digital goods for Short Lead Time for Mbr Water - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo , The product will supply to all over the world, such as: Slovakia, Albania, Iran, We have customers from more than 20 countries and our reputation has been recognized by our esteemed customers. Never-ending improvement and striving for 0% deficiency are our two main quality policies. Should you need anything, don't hesitate to contact us.
  • Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
    5 Stars By Yannick Vergoz from Seattle - 2017.09.29 11:19
    The goods we received and the sample sales staff display to us have the same quality, it is really a creditable manufacturer.
    5 Stars By Mildred from Ghana - 2018.06.30 17:29
    Write your message here and send it to us