日本熟日本熟妇在线视频_超碰大字幕在线大字幕_色屋任你精品亚洲香蕉_思思热在线视频在线

Short Lead Time for Mbr Water - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Often customer-oriented, and it's our ultimate target to become not only probably reputable, trustable and honest provider, but also the partner for our customers for Toray Uf Membrane , Mbr Treatment Plant , Ultrafiltration Water Treatment , Welcome to build long-term marriage with us. Lower rate Forever High-quality in China.
Short Lead Time for Mbr Water - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo Detail:

Applications

● Purification of surface water.
● Reuse of heavy metal waste water.
● Pretreatment of RO.

Filtration Performance

Below filtration effects are proved according to the use of modified PVDF hollow fiber ultrafiltration membrane in different types of water:

No. Item Water?Output?Index
1 TSS ≤1mg/L
2 Turbidity ≤ 1

Specifications

Size

product-description1

Chart 1 MBR Size

Technical Parameters

Filtering?Direction Outside-in
Membrane?Material Reinforced?Modified?PVDF
Precision 0.03 ?micron
Membrane?Area 30m2
Membrane?ID/OD 1.0mm/ 2.2mm
Size 1250mm×2000mm×30mm
Joint?Size Φ24.5mm

Component Material

Component Material
Hollow?Fiber?Membrane Reinforced?Modified?PVDF
Sealing Compound Epoxy?Resins?+?Polyurethane (PU)
Housing ABS

Using Conditions

Proper pretreatments must be set when raw water contains a lot of impurities/coarse particles or large proportion of grease. Defoamer must be used to remove foams in membrane tank when necessary, please use alcoholic defoamer which is not easy to scale.

Item Limit Remark
PH?Range 5-9 (2- 12 when?washing) Neutral?PH?is?better?for?bacterial?culture
Particle?Diameter <2mm Prevent?sharp?particles?to?scratch?membrane
Oil?&?Grease ≤2mg/L Prevent?membrane?fouling/sharp?flux?decrease
Hardness ≤150mg/L Prevent?membrane?scaling

Application Parameters

Designed?Flux 15~40L/m2.h
Backwashing?Flux Twice?the?designed?flux
Operating?Temperature 5~45°C
Maximum?Operating?Pressure -50KPa
Suggested?Operating?Pressure ≤-35KPa
Maximum?backwashing?Pressure 100KPa
Operating?Mode Continuous?opeartion, intermittent?backwashing?air?flushing
Blowing?Mode Continuous?Aeration
Aeration?Rate 4m3/h.piece
Washing?Period Clean?water?backwashing?every?1~2h; CEB?every?1~2 days;Offline?washing?every?6~12 months

(Above?information?is?for?reference?only, please?adjust

according?to?actual?differential?pressure?change?rule)


Product detail pictures:

Short Lead Time for Mbr Water - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo detail pictures


Related Product Guide:

We've been proud with the significant shopper fulfillment and wide acceptance due to our persistent pursuit of front end of range both of those on solution and repair for Short Lead Time for Mbr Water - MCR Membrane Module Reinforced PVDF BM-SLMCR-30 Replacing Project – Bangmo , The product will supply to all over the world, such as: Cancun, Islamabad, Austria, With the goal of zero defect. To care for the environment, and social returns, care employee social responsibility as own duty. We welcome friends from all over the world to visit and guide us so that we can achieve the win-win goal together.
  • It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
    5 Stars By Eve from azerbaijan - 2017.07.28 15:46
    The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
    5 Stars By Cherry from Curacao - 2018.09.19 18:37
    Write your message here and send it to us